ADAPTIVE REUSE OF MILL BUILDING
Adaptive Reuse and Addition to Mill Building; Boston, MA
Vanecko, Ltd. was the architect for the adaptive reuse of a 14,400 s.f. mill building in Charlestown. The existing ca. 1910 heavy-timber and brick masonry structure was converted into a woodwork shop, office and studio spaces.
•Phase 1 work included new egress components, HVAC & fire protection systems, wood shop, offices and artist studios build-out.
•Phase 2 work included an accessible entry, elevator, and wood framed addition.
•Design included coordination of consultants for geo-technical and structural engineering for new timber piling foundation.
•Provided comprehensive State Building Code Article 34, and City of Boston Zoning Code reviews.
COMMERCIAL & INSTITUTIONAL PROJECTS